In order to get your building permit from Parks Canada you require a Municipality of Jasper (MOJ) Letter of Approval. 

The following conditions must be met in order to get your Letter of Approval: 

  • Submit a completed Development Application and Agreement (form below) accompanied by a full set of drawings. 
  • For Cabin Creek:include a site plan with final grade elevations which reflect the Cabin Creek West Grading Plan. 
  • For Commercial and Apartment builds: include a site plan which indicates the locations of all utility services, vehicle egress and locations of waste management bins (civil site plan). 
  • Completed Fire Safety Plan approved by the Fire Department. 
  • Payment of Off-Site Levies (if applicable) 

If you have any questions during the application please contact us at muniapprovals@jasper-alberta.ca 

Please familiarize yourself with the following MOJ Water/Sewer Bylaws: 

Jasper Bylaw #178 - Water Services Bylaw 

Jasper Bylaw #014 - Jasper Sewer and Drainage Bylaw  

Utility Connections 

  • We strongly recommend replacing the abandoned utility services cut/capped during the demolition process, and installing single connections to the main service laterals at the leaseholder’s property line. 
  • The leaseholder is responsible for all costs associated with the replacement of utility services within the leasehold and, any  upsizing or relocation of utilities from the service mains. 
  • We will assume responsibility for all work and costs associated with the utility mains, laterals, CC's, sewer inspections, and lamping wells which will be repaired, replaced, inspected or installed at the time of utility connections. 
  • We must inspect the sewer before connections are made. Any debris in the sewer must be removed into the leasehold. Failure to do so may lead to obstructions and damage the the sewer mains. 
  • The Utility Team must inspect all connections before backfilled as stipulated in Bylaw #178 Section 10.1.1. 
  • Warning: Abandoned utilities within the leasehold might not be connected to the main services laterals. 

For properties in Cabin Creek area (Cabin Creek Drive, Patricia Crescent, Brewster Crescent and Swift Crescent) 

  • Water/Sewer services were cut and capped at the property line (approximately 1m from curb/sidewalk). 
  • Reconnections to MOJ Utilities will require the excavation of the new service trench containing live ATCO Electrical, ATCO Gas and Communication lines, located approx. 3m inside the leaseholder's property line. 
  • Ensure you are familiar with ATCO's requirements when working in Cabin Creek: ATCO Energy - Cabin Creek 
  • Capital Projects Page

All utility work must be scheduled 2 weeks in advance. 

To schedule utility work, please contact the Construction Utility Coordinator: